Tools › Electrical and Controls › Power Systems › Power Flow Solver › Example

Three-bus power flow with a slack, a PV and a PQ bus: mismatches, Jacobian and corrections of the first iteration

ToolPower Flow Solver
Sourceoriginal
LevelUndergraduate

Problem

Three 230 kV buses are joined by three lines (per unit on 100 MVA: North–Hydro 0.020 + j0.08, B 0.04; North–City 0.015 + j0.06, B 0.03; Hydro–City 0.025 + j0.10, B 0.05). North is the slack bus at 1.04 pu; Hydro generates 120 MW at 1.02 pu and carries a 50 MW, 20 Mvar load; City is a load of 250 MW and 110 Mvar. Find the voltages, the slack generation, the reactive output at Hydro and the line losses.

Inputs to Enter

  • Base 100 MVA, per-unit branch data, Newton-Raphson, flat start
  • Buses: North slack 1.04; Hydro PV 1.02, 120 MW generated, 50 MW + 20 Mvar load, Q limits −40 to 100 Mvar; City PQ 250 MW + 110 Mvar
  • Line ratings 200, 250 and 200 MVA
Open the Power Flow Solver tool

Answers

  • Unknowns δ(Hydro), δ(City), |V|(City); Y(City, City) = 6.2745 − j25.0580 pu
  • Iteration 1 mismatches ΔP(Hydro) = 0.7120, ΔP(City) = −2.2961, ΔQ(City) = −0.2443 pu; Jacobian rows [22.08, −9.60, −2.40], [−9.60, 25.914, 6.071], [2.40, −6.478, 24.202]
  • Corrections Δδ = −0.007742 and −0.084019 rad, Δ|V| = −0.031817: City at 0.9682 pu, −4.814° after one iteration
  • Largest mismatch 2.296, 0.0962, 0.000629, 2.9 × 10⁻⁸ pu: 3 iterations
  • City 0.9631 pu (221.51 kV) at −5.022°; Hydro at −0.510°, generating 33.46 Mvar; slack 187.67 MW and 115.06 Mvar
  • Losses 7.67 MW: 5.336 MW in North–City (170.42 MW, 95.48 Mvar sent; 78.1 % of 250 MVA), 2.195 MW in Hydro–City, 0.142 MW in North–Hydro

Notes