Johnson, S. M. (1954). "Optimal Two- and Three-Stage Production Schedules with Setup Times Included." Naval Research Logistics Quarterly, Vol. 1, No. 1, pp. 61–68.
Moore, J. M. (1968). "An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs." Management Science, Vol. 15, No. 1, pp. 102–109.
Lawler, E. L. (1973). "Optimal Sequencing of a Single Machine Subject to Precedence Constraints." Management Science, Vol. 19, No. 5, pp. 544–546.
Smith, W. E. (1956). "Various Optimizers for Single-Stage Production." Naval Research Logistics Quarterly, Vol. 3, No. 1–2, pp. 59–66.
Palmer, D. S. (1965). "Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum." Operational Research Quarterly, Vol. 16, No. 1, pp. 101–107.
Campbell, H. G., Dudek, R. A., and Smith, M. L. (1970). "A Heuristic Algorithm for the n Job, m Machine Sequencing Problem." Management Science, Vol. 16, No. 10, pp. B630–B637.
Nawaz, M., Enscore, E. E., and Ham, I. (1983). "A Heuristic Algorithm for the m-Machine, n-Job Flow-Shop Sequencing Problem." Omega, Vol. 11, No. 1, pp. 91–95.
Giffler, B., and Thompson, G. L. (1960). "Algorithms for Solving Production-Scheduling Problems." Operations Research, Vol. 8, No. 4, pp. 487–503.
Fisher, H., and Thompson, G. L. (1963). "Probabilistic Learning Combinations of Local Job-Shop Scheduling Rules." In Muth, J. F., and Thompson, G. L. (eds.), Industrial Scheduling, Prentice-Hall, Englewood Cliffs, NJ, pp. 225–251.
Beasley, J. E. (1990). "OR-Library: Distributing Test Problems by Electronic Mail." Journal of the Operational Research Society, Vol. 41, No. 11, pp. 1069–1072.
Carlier, J. (1982). "The One-Machine Sequencing Problem." European Journal of Operational Research, Vol. 11, No. 1, pp. 42–47.
Carlier, J., and Pinson, E. (1989). "An Algorithm for Solving the Job-Shop Problem." Management Science, Vol. 35, No. 2, pp. 164–176.
Manne, A. S. (1960). "On the Job-Shop Scheduling Problem." Operations Research, Vol. 8, No. 2, pp. 219–223.
Graham, R. L. (1969). "Bounds on Multiprocessing Timing Anomalies." SIAM Journal on Applied Mathematics, Vol. 17, No. 2, pp. 416–429.
Croes, G. A. (1958). "A Method for Solving Traveling-Salesman Problems." Operations Research, Vol. 6, No. 6, pp. 791–812.
Da Col, G., and Teppan, E. C. (2019). "Google vs IBM: A Constraint Solving Challenge on the Job-Shop Scheduling Problem." Electronic Proceedings in Theoretical Computer Science, Vol. 306, pp. 259–265.
Conway, R. W., Maxwell, W. L., and Miller, L. W. (1967). Theory of Scheduling. Addison-Wesley, Reading, MA.
Baker, K. R., and Trietsch, D. (2009). Principles of Sequencing and Scheduling. John Wiley and Sons, Hoboken, NJ.
Pinedo, M. L. (2016). Scheduling: Theory, Algorithms, and Systems, 5th ed. Springer, New York.
Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production. Productivity Press, Cambridge, MA.
Worked Examples
Published examples this tool reproduces; each page lists the inputs to enter and the printed answers.
DISCLAIMER: The methods and calculation on aNOWysis.com are provided as means to educate the reader. There is no warranty, expessed or implied, as to the relevance or accuracy of the methods or calculations. All calculations should be checked by a qualified analyst for appropriateness and accuracy. We will not be held liable for any damages, injuries or deaths caused by using methods or calculations from this site.
Terms of Service & Liability Disclaimer
Please read and accept these terms for the best experience with our analysis tools.
⚠️ Important Legal Notice
BY USING THESE ANALYSIS TOOLS, YOU ACKNOWLEDGE AND AGREE THAT:
NO WARRANTY: These tools are provided "AS IS" and may contain errors, bugs, or inaccuracies
EDUCATIONAL USE ONLY: Results are for preliminary analysis and educational purposes only
NOT PROFESSIONAL ADVICE: These tools do not replace professional engineering judgment
VERIFICATION REQUIRED: All results must be independently verified by a licensed professional engineer
POTENTIAL RISKS: Incorrect results could lead to catastrophic failures causing property damage, injury, or death
Limitation of Liability
UNDER NO CIRCUMSTANCES SHALL AVERY AEROSPACE CORPORATION, ITS DIRECTORS, EMPLOYEES, OR AFFILIATES BE HELD LIABLE FOR:
Any direct, indirect, incidental, consequential, special, punitive, or exemplary damages
Property damage, personal injury, or death resulting from use of these tools
Errors, inaccuracies, or incorrect calculations produced by the tools
Design failures, structural collapses, or system malfunctions based on tool outputs
Any damages whatsoever, even if we have been advised of the possibility of such damages
Your Responsibilities
You agree to:
Use at Your Own Risk: You assume all risks associated with using these analysis tools
Professional Verification: Engage licensed professional engineers for all critical design work
Independent Judgment: Exercise independent engineering judgment and not rely solely on tool outputs
Code Compliance: Ensure all designs comply with applicable codes, standards, and regulations
Indemnification: Defend and hold harmless the Company from any claims arising from your use of these tools
Acceptance
By clicking "I Accept and Agree" below, you acknowledge that you have read, understood, and agree to be bound by: