U.S. Department of the Army (1991). Coordinated Power System Protection. Technical Manual TM 5-811-14, Headquarters, Department of the Army, Washington, DC.
Institute of Electrical and Electronics Engineers (1996). IEEE Standard Inverse-Time Characteristic Equations for Overcurrent Relays. IEEE Std C37.112-1996, New York.
International Electrotechnical Commission (2009). Measuring Relays and Protection Equipment, Part 151: Functional Requirements for Over/Under Current Protection. IEC 60255-151:2009, Edition 1.0, Geneva.
Guzman-Casillas, A., and Anderson, L. S. (2009). Dynamically Configurable Relay Element and Related Methods. U.S. Patent 7,570,469 B2, U.S. Patent and Trademark Office, Alexandria, VA.
Institute of Electrical and Electronics Engineers (2001). IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. IEEE Std 242-2001, New York.
Institute of Electrical and Electronics Engineers (2018). IEEE Guide for Liquid-Immersed Transformers Through-Fault-Current Duration. IEEE Std C57.109-2018, New York.
Worked Examples
Published examples this tool reproduces; each page lists the inputs to enter and the printed answers.
DISCLAIMER: The methods and calculation on aNOWysis.com are provided as means to educate the reader. There is no warranty, expessed or implied, as to the relevance or accuracy of the methods or calculations. All calculations should be checked by a qualified analyst for appropriateness and accuracy. We will not be held liable for any damages, injuries or deaths caused by using methods or calculations from this site.
Terms of Service & Liability Disclaimer
Please read and accept these terms for the best experience with our analysis tools.
⚠️ Important Legal Notice
BY USING THESE ANALYSIS TOOLS, YOU ACKNOWLEDGE AND AGREE THAT:
NO WARRANTY: These tools are provided "AS IS" and may contain errors, bugs, or inaccuracies
EDUCATIONAL USE ONLY: Results are for preliminary analysis and educational purposes only
NOT PROFESSIONAL ADVICE: These tools do not replace professional engineering judgment
VERIFICATION REQUIRED: All results must be independently verified by a licensed professional engineer
POTENTIAL RISKS: Incorrect results could lead to catastrophic failures causing property damage, injury, or death
Limitation of Liability
UNDER NO CIRCUMSTANCES SHALL AVERY AEROSPACE CORPORATION, ITS DIRECTORS, EMPLOYEES, OR AFFILIATES BE HELD LIABLE FOR:
Any direct, indirect, incidental, consequential, special, punitive, or exemplary damages
Property damage, personal injury, or death resulting from use of these tools
Errors, inaccuracies, or incorrect calculations produced by the tools
Design failures, structural collapses, or system malfunctions based on tool outputs
Any damages whatsoever, even if we have been advised of the possibility of such damages
Your Responsibilities
You agree to:
Use at Your Own Risk: You assume all risks associated with using these analysis tools
Professional Verification: Engage licensed professional engineers for all critical design work
Independent Judgment: Exercise independent engineering judgment and not rely solely on tool outputs
Code Compliance: Ensure all designs comply with applicable codes, standards, and regulations
Indemnification: Defend and hold harmless the Company from any claims arising from your use of these tools
Acceptance
By clicking "I Accept and Agree" below, you acknowledge that you have read, understood, and agree to be bound by: