| Source | Federal Highway Administration (2025). Manual on Uniform Traffic Control Devices for Streets and Highways, 11th ed. with Revision 1. U.S. Department of Transportation, Washington, DC. Section 4C.02 and Table 4C-1 (pp. 653–654), Section 4C.03 and Figure 4C-1 (pp. 654–655), Section 4C.01, paragraph 03 (p. 651). The counts are original and illustrative. |
| Level | Professional |
Problem
A major street with two lanes on each approach meets a one-lane side street. Fourteen hourly counts show sharp morning and evening peaks. What do the counts give under Warrant 1 (eight-hour volume), Warrant 2 (four-hour volume) and Warrant 3 (peak hour) with the 100 percent values?
Inputs to Enter
- Major street 2 or more lanes, minor approach 1 lane, standard (100 %) values
- Hour, major street (both approaches), minor approach, vph: 6-7 AM 610 / 95; 7-8 AM 1,180 / 168; 8-9 AM 1,090 / 142; 9-10 AM 720 / 88; 10-11 AM 640 / 70; 11 AM-12 690 / 84; 12-1 PM 760 / 102; 1-2 PM 700 / 86; 2-3 PM 740 / 92; 3-4 PM 930 / 121; 4-5 PM 1,210 / 155; 5-6 PM 1,265 / 149; 6-7 PM 840 / 96; 7-8 PM 560 / 62
Answers
- Table 4C-1, 2 or more lanes / 1 lane: Condition A 600 and 150 vph, reached in 2 hours; Condition B 900 and 75 vph, reached in 5 hours; 8 looked for: Warrant 1 not met (80 % columns: A 5 hours, B 9 hours)
- Figure 4C-1, middle curve: 106.6 vph at 1,180, 123.8 at 1,090, 101.5 at 1,210, 92.6 at 1,265; the four peak hours plot 61.4, 18.2, 53.5 and 56.4 vph above it: 4 hours, 4 looked for, Warrant 2 met
- Figure 4C-3: no hour above the curve (the busiest hour is 50.6 vph below 199.6): Warrant 3, Item B, not met
- Section 4C.01, paragraph 03: the satisfaction of a warrant shall not in itself require the installation of a traffic control signal
Notes
Open this case in the tool: /analysis-tools/civil/transportation/traffic-signal-warrants/?try=four-hour-not-eight. The curve values are read from the manual's drawing (tabulated every 10 vph, within about 3 vph of the printed line); the 5-6 PM hour misses Condition A by one vehicle on the minor approach (149 against 150). The result describes the volumes; the manual's engineering study decides.