Problem

A plant driveway (one lane, STOP-controlled) meets a one-lane road at a three-approach intersection. For most of the day the driveway carries 35 to 96 vph; in the 3-4 PM shift change it carries 395 vph against 615 vph on the road, with 4.6 vehicle-hours of stopped delay and 1,010 vehicles entering. What does Warrant 3 give?

Inputs to Enter

  • Advanced mode. Major street 1 lane, minor approach 1 lane, standard values; 3 approaches
  • Hour, major, minor, vph: 6-7 AM 520 / 64; 7-8 AM 580 / 48; 8-9 AM 470 / 35; 11 AM-12 430 / 41; 12-1 PM 450 / 52; 2-3 PM 490 / 58; 3-4 PM 615 / 395; 4-5 PM 640 / 96; 5-6 PM 560 / 44
  • Peak-hour delay 4.6 veh-h, approach volume 395 vph, entering volume 1,010 vph
Open the Traffic Signal Warrants tool

Answers

  • Item B: Figure 4C-3, curve for 1 lane and 1 lane, is 359.8 vph at 615 vph; the 3-4 PM hour is 35.2 vph above it: 1 hour, 1 looked for, met
  • Item A: 4.6 ≥ 4 veh-h (one-lane approach), 395 ≥ 100 vph, 1,010 ≥ 650 vph (three approaches): all three reached, met
  • Warrant 1: Condition A 1 hour, Condition B 0 hours; Warrant 2: 1 hour above Figure 4C-1 (4 looked for): neither met
  • The 11 AM-12 hour (430 vph) lies to the left of where the Figure 4C-3 curve starts (440 vph) and is not counted

Notes

Open this case in the tool: /analysis-tools/civil/transportation/traffic-signal-warrants/?try=shift-change-peak-hour. The manual's guidance limits Warrant 3 to unusual cases such as manufacturing plants that discharge many vehicles in a short time, and where it is the only warrant met a signal justified by the study may flash outside the peak (Section 4C.04, paragraphs 02 and 05). The delay is a field measurement entered by the user.