Tools › Civil and Geotechnical › Soils › Seepage Flow Net › Example

Double-wall cofferdam in a river: computed flow net, exit gradient and the heave prism

ToolSeepage Flow Net
SourceOriginal illustrative case. Method: U.S. Army Corps of Engineers (1986). Seepage Analysis and Control for Dams. Engineer Manual EM 1110-2-1901, U.S. Army Corps of Engineers, Washington, DC. Chapter 4 (flow nets, critical gradient, heave).
LevelUndergraduate

Problem

Two sheet pile walls 26 ft apart are driven 30 ft into a 50 ft layer of sand over rock. The river stands 13 ft above the bed and the excavation between the walls is taken 16 ft below the bed and pumped dry to its floor. Find the seepage into the excavation, the exit gradient and the factors against piping and heave.

Inputs to Enter

  • Cofferdam, two walls; layer thickness 50 ft, pile penetration 30 ft, excavation depth 16 ft, clear width 26 ft (U.S. units)
  • Upstream water 13 ft above the bed, downstream water 0 ft above the excavation floor
  • Permeability 1 × 10⁻² ft/min, soil unit weight 124 lbf/ft³, water 62.4 lbf/ft³
Open the Seepage Flow Net tool (loaded with this example)

Answers

  • Head difference h = 13 + 16 − 0 = 29 ft
  • Solved field: N_f / N_d = 0.3698 (0.3595 on 24 cells across the layer, 0.3646 on 48, extrapolated); an independent scipy solution gives 0.3700
  • q = k h N_f / N_d = 154 ft³/day per ft of wall (309 ft³/day per ft of cofferdam, both walls)
  • Drawn net: 11 head drops of 2.64 ft and 4.07 flow channels
  • Exit gradient 0.851 against a critical gradient (124 − 62.4) / 62.4 = 0.987: ratio 1.16
  • Heave prism 14 ft deep and 7 ft wide: mean head on its base 12.37 ft, factor (124 − 62.4) × 14 / (62.4 × 12.37) = 1.12, lower than the piping ratio

Notes

The tool's default inputs are this case; press Submit, or open /analysis-tools/civil/soils/seepage-flow-net/?try=cofferdam-heave. Illustrative numbers. The page states the factors; it does not say whether they are enough. The prism of depth D and width D / 2 is Terzaghi's for a single row of piles, applied here unchanged.

More Examples for This Tool