Tools › Finance and Business › Pricing › Contract Profit Objective › Example
DFARS weighted guidelines: profit objective of a firm-fixed-price contract with progress payments, built from the rule's own three examples
| Tool | Contract Profit Objective |
| Source | Department of Defense (2026). Defense Federal Acquisition Regulation Supplement, Subpart 215.4, Contract Pricing, 215.404-71-1 to 215.404-71-5. 48 CFR Chapter 2, Washington, DC. Composite example of 215.404-71-2(b)(3), costs financed of 215.404-71-3(e)(3), contract length example of 215.404-71-3(f)(3); text as read in the eCFR on 17 November 2026. |
| Level | Professional |
Problem
A firm-fixed-price contract with progress payments has a cost objective of 3,500,000 (material 400,000, subcontracts 600,000, direct labor 800,000, indirect expenses 1,200,000, other direct charges 100,000, G&A 400,000) and a facilities capital cost of money of 21,375 at a 4.75 % cost of money rate, with 60 % of the capital in equipment. Using the rule's examples (technical 60 % at 5.0 and management / cost control 40 % at 4.0; progress payments at 80 %; deliveries in months 34, 36, 38 and 40) and the normal values for contract type risk and equipment, find each line of the weighted guidelines profit objective and the total.
Inputs to Enter
- Cost objective: Material 400,000, Subcontracts 600,000, Direct Labor 800,000, Indirect Expenses 1,200,000, Other Direct Charges 100,000, G&A 400,000
- Performance risk: standard range, Technical Weighting 60 %, Technical Value 5.0 %, Management Value 4.0 %
- Contract type: Firm-fixed-price, with progress payments; Assigned Value 3 % (normal value)
- Working capital: Portion Financed 20 %, Period 37 months, Treasury Rate 4.75 % (July to December 2026)
- Cost of Money 21,375, Cost of Money Rate 4.75 %, Land 10 %, Buildings 30 %, Equipment 60 %, Equipment Value 17.5 %; Cost Efficiency 0 %
Answers
- Composite value = 0.60 · 5.0 + 0.40 · 4.0 = 3.0 + 1.6 = 4.6 % (rule: 3.0, 1.6, 4.6); Block 23 = 4.6 % · 3,500,000 = 161,000.00
- Block 24 = 3 % · 3,500,000 = 105,000.00
- Costs financed = 20 % · 3,500,000 = 700,000 (rule: 80 % progress payments leave 20 %); length factor for 37 months = 1.15 (rule: 1.15); Block 25 = 700,000 · 1.15 · 4.75 % = 38,237.50, below the limit of 4 % of cost = 140,000
- Facilities capital employed = 21,375 / 4.75 % = 450,000: land 45,000, buildings 135,000, equipment 270,000; Block 28 = 17.5 % · 270,000 = 47,250.00
- Block 30 total profit objective = 161,000 + 105,000 + 38,237.50 + 47,250 = 351,487.50 = 10.04 % of cost; total price 3,872,862.50
Notes
The tool's default inputs are this case; press Submit. Only the three small examples (composite 4.6, 20 percent financed, 37 months giving 1.15) and the normal values are printed in the rule; the costs are made up and the totals are hand arithmetic, checked in test_contract_profit_objective.php together with every cell of the contract type and contract length tables. No complete worked DD Form 1547 was found in a public document. The Treasury rate changes each half year. A structured illustration of the regulation, not contracting advice.