Problem

Ten identical modules operate continuously, each with a failure rate of 481.07 failures per million hours. A failed module is replaced from a common pool of spares and returns to the pool two weeks (336 hours) later. How many spares are needed for each operating position to hold a working module at least 99 % of the time, and what protection against a stock-out does that stock give?

Inputs to Enter

  • Systems 10, quantity per system 1, 24 operating hours per day
  • Failure rate 481.07 per million operating hours (MTBF 2,079 h); repairable, turnaround 14 days
  • Confidence of no stock-out 95 %; availability target 0.99
Open the Spares Provisioning tool (loaded with this example)

Answers

  • Demand 10 · 24 · 0.00048107 = 0.1155 per day (42.14 per year); pipeline m = 0.1155 · 14 = 1.616 units in repair on average
  • Poisson: 4 spares give P(no stock-out) = 0.9754 (3 spares 0.9189), fill rate 0.9189, expected backorders 0.03268; a 95 % fill rate needs 5 spares
  • Supply availability with 4 spares: 0.9967 by the Poisson model, 0.9970 by the finite-fleet birth-and-death chain; with 3 spares 0.9886 and 0.9897, below the target
  • Finite-fleet stock for an up-time ratio of 0.99: N = 4 (book: 4, Table 1, row λ = 481.07 × 10⁻⁶, 1/μ = 336 h, n = 10)
  • Wait per demand with 4 spares: 0.283 days

Notes

The tool's default inputs are this case; press Submit. The test script reproduces all 72 cells of the report's Table 1, the 84 cells of its Table 2 for (m, n) systems and the theoretical down-time ratios of its Tables 3 to 5. The Multi-item optimisation analysis opens on the six-module example of DSN Progress Report 42-42 (Eisenberger and Lorden, 1977, Table 1), whose printed package of 3, 2, 3, 4, 5 and 2 spares is the list the marginal analysis reaches at a cost of 43,794.