Tools › Civil and Geotechnical › Foundations › Pile Capacity and Lateral Load › Example

HP 12x74 at the FHWA GEC 12 North Abutment: Nordlund shaft and toe resistance in three sand layers, factored resistance, uplift, group, neutral plane, Broms and driving formulas

ToolPile Capacity and Lateral Load
SourceHannigan, P. J., Rausche, F., Likins, G. E., Robinson, B. R., and Becker, M. L. (2016). Design and Construction of Driven Pile Foundations, Volume III: Comprehensive Design Examples. Geotechnical Engineering Circular No. 12, FHWA-NHI-16-064, Federal Highway Administration, Washington, DC (Block 10, North Abutment: Figure D-7, Tables D-4 to D-6); Volume I, FHWA-NHI-16-009 (Section 7.2.1.3.1, Tables 7-6 / 7-7, Figures 7-9 to 7-16, Table 7-1); Volume II, FHWA-NHI-16-010 (Table 13-4).
LevelProfessional

Problem

An HP 12x74 (b 12.1 in, steel area 21.8 in², box toe area 1.02 ft²) is driven 60 ft below a pile cap whose bottom is 5 ft below grade through loose silty fine sand (25 ft, 105 pcf, φ′ 33°), medium dense coarse sand (25 ft, 112 pcf, φ′ 36°) and dense gravel with sand (125 pcf, φ′ 36° on the shaft, 40° at the toe); the water table is 15 ft below grade. Find the Nordlund shaft and toe resistances, the nominal and factored resistance (φ 0.45) against a 300-kip factored load, the uplift resistance, the 3 × 4 group at 3 ft, the neutral plane under a 200-kip permanent load, the Broms lateral capacity and the elastic-foundation deflection of a fixed-head pile under 20 kips with n_h 25 pci, and the driving-formula resistances for the ICE I-46 case history (10.15 kips, 8.14 ft stroke, 49 blows/ft).

Inputs to Enter

  • Method FHWA (Nordlund / α), LRFD; H-pile, H-section, box toe area; b 12.1 in, A_st 21.8 in², L 60 ft, head 5 ft, water table 15 ft, toe φ′ 40°, E_p 29,000 ksi, I_p 569 in⁴, M_y 391 kip-ft
  • Layers: sand 25 ft / 105 pcf / 33° / N 9; sand 25 ft / 112 pcf / 36° / N 17; sand 47 ft / 125 pcf / 36° / N 39
  • Loads: Q_c 300 kip, permanent 200 kip, uplift 60 kip, lateral 20 kip at the head; φ_stat 0.45, φ_up 0.35, φ_bl 0.60, φ_ug 0.50; group 3 × 4 at 3 ft; neutral plane with 50 % toe mobilization; E_s 1,416 ksf, μ 0.3, C_p 0.03; fixed head, n_h 25 pci, y_all 0.5 in; ICE I-46: 10.15 kip, 8.14 ft, set 0.245 in, F_eff 0.47
Open the Pile Capacity and Lateral Load tool (loaded with this example)

Answers

  • Nordlund shaft: δ/φ 0.79 (curve f at V 0.151 ft³/ft), K_δ 1.114 (φ′ 33) / 1.392 (36), C_F 0.92 / 0.90; R_s = 19.1 kips at 10 ft, 51.6 at 20, 105.8 at 30, 172.0 at 40, 343.8 at 60 ft (Table D-6: 19.1, 51.6, 105.9, 172.1, 344.1)
  • Toe at 60 ft: α_t 0.75, N′_q 156 (Figure 7-16), σ′_p 4,180 psf limited to 3 ksf: R_p = 355.9 kips (Table D-6 428.1, the DrivenPiles program's chart readings); R_n = 699.7 kips, R_r = 0.45 R_n = 314.9 kips, M.S. +0.05 against 300 kips
  • Uplift R_t = 0.35 × 343.8 = 120.3 kips (M.S. +1.01); group η 1.0 (sand), R_ng = 12 × 699.7 = 8,397 kips, group uplift governed by the piles 1,444 kips against the 1H:4V soil block; neutral plane 38.4 ft below the head, drag force 160.9 kips, maximum pile load 360.9 kips; Vesić settlement 0.28 in
  • Broms long fixed-head pile in sand (φ′ 35°, γ′ 60.9 pcf averaged): H_u = 77.7 kips, M_max = M_y; elastic foundation n_h 25 pci: T = 4.84 ft, L/T 12.4, y_0 = 0.928 H T³/(E I) = 0.220 in, fixing moment 0.927 H T = 89.7 kip-ft; characteristic load method P_c 3,526 kips, y 0.149 in, M 78.4 kip-ft
  • Driving formulas (Table 13-4 case history): Engineering News 2,872, FHWA Gates 710, WSDOT 950 (F_eff 0.47), MPF12 585 kips (printed 2,872 / 710 / 950 / 585)

Notes

The tool's default inputs are this pile; press Submit. The shaft resistances reproduce Table D-6 to 0.1 kip at every depth; the toe differs by the program's reading of Figures 7-15 / 7-16 (N′_q about 190 at 40° in DrivenPiles against 156 digitized here). The group, loads, lateral soil moduli and settlement parameters are illustrative additions to the published example (stated on the page); every formula is checked by test_pile_capacity.php (512 checks) against the GEC 12, NHI-05-042 and GEC 10 printed values and the numpy / scipy script in References/Pile-Capacity/checks/.